Tanzanian samples 19.4 g/t gold
over 27.99 metres at Buckreef, Tanzania
25
February 2021
anzanian
Gold Corp. [TNX-TSX; TRX-NYSE American], 55%, (operating through its wholly
owned subsidiary in Tanzania) and its joint venture partner, The State Mining
Company, 45%, have received initial and highly favourable metallurgical test
results from the sulphide component of the Buckreef gold mine mineral resource.SGS
Canada Inc. (SGS) was retained to complete initial metallurgical test work at
their Lakefield facility on the sulphide component of the mineral resource. SGS
flowsheets will be a cornerstone of the feasibility study and help prove the
viability of the project to financiers and stakeholders as Buckreef progresses
towards full operation. SGS has reviewed the information in the press release.The
initial metallurgical test work is now concluding. SGS has now been
commissioned to undertake the metallurgical variability phase for Buckreef.
Highlights
Three
diamond drill core samples were taken from the fresh rock (‘sulphide’ mineral
resource) of the Buckreef deposit for the purposes of metallurgical test work.
The following intercepts and gold recovery rates were observed.Drill hole MC01
returned 0.54 g/t gold over 78.88 metres – 94.1%. MC02 returned 19.4 g/t gold
over 27.99 metres – 95.4%. MC03 returned 1.71 g/t gold over 52.53 metres – 85.3%.
Stephen
Mullowney, CEO (TanGold) commented, “The initial metallurgical results from a
reputable and prestigious organization (SGS Lakefield) have indicated that a
well-known and simple flowsheet for our large high-grade deposit and plant is
most likely. The initial recoveries are excellent, and I look forward with
confidence to the results of the variability testing.”
Andrew
Cheatle, COO (TanGold) added, “The initial metallurgical recovery results are
excellent and typical of Archean shear zone type hosted gold deposits. These
results also firmly underscore our overall plan to have two plants with two
different flowsheets; one plant to treat gold bearing oxides and a second plant
to treat gold bearing sulphide or primary materials. We look forward to continuing
to work with SGS on the metallurgical study.”In 2020, three diamond drill holes
were completed for the purposes of initial, modern era metallurgical test work.Measured
Resources stand at 19.98MT at 1.99 g/t gold containing 1,281,161 ounces of gold
and Indicated Resources aret 15.89MT at 1.48 g/t gold containing 755,119 ounces
of gold for a combined tonnage of 35.88MT at 1.77g/t gold containing 2,036,280
ounces of gold. Inferred Resources are 17.8MT at 1.11g/t gold for contained
gold of 635,540 ounces of gold.
Source:
https://resourceworld.com
|